provided for e-mail addresses and contact affiliation. Step-by-step
This information
The Authorized Employee can check a box to designate a
If you have any questions, please call the Environmental Assistance Center (800-662-9278 or egle-assist@michigan.gov) for a program specialist. 09/2015" on the bottom right corner.
You must create three (3) paper copies of the completed form. Instructions have been added to Item 6 requesting that all pages of the
downloaded
If you need assistance identifying permits for a new venture, refer to our EGLE Permit Checklist first. Should there be a contested case regarding a permit decision, an Administrative Law Judge shall preside over and issue the final decision and order. Adobe Acrobat format.
in the gray-shaded fields. The
Rule 204.
along with two (2) copies of any plans, specifications or drawings required by
Department of Environment, Great Lakes & Energy - DEQ Key Topics Permits MICHIGAN ECONOMIC DEVELOPMENT CORPORATION: Consider contacting the Michigan Economic Development Corporation to see whether their incentives and services may assist in your new venture. equipment is new or existing. If a permit applicant is having a dispute with EGLE during the application process, they can petition the EGLE Director to intervene. For more information, go to the Environmental Permit Review Commission Web site. The check boxes for "Reason for Application" state whether the
instructions are also available for conducting a BACT
numbered and dated.
Many are accessible electronically.
09/2015" on the bottom the instructions should be submitted. The following describes remedies available to the permit applicant, as well as third parties, that have suffered or could suffer an injury as a result of the decision. A number of regulatory programs administered by EGLE provide the right to a contested case hearing. Information has been added to the top of the form encouraging the applicant to
For more information about filing a petition for a contested case, go to the, Should there be a contested case regarding a permit decision, an Administrative Law Judge shall preside over and issue the final decision and order. may be viewed in Adobe Acrobat format. any questions. The Contact has been identified as the person the DEQ should contact with
The application must include the original
For more information, go to the, This guidebook is written by EGLE to assist manufacturers with regulations and can be be foundâ online at, Leaking Underground Storage Tanks Program, Soil Erosion and Construction Storm Water, Hazardous Waste and Liquid Industrial By-Products Management, Office of the Clean Water Public Advocate, Floodplain Management/National Flood Insurance, Permit Information Checklist for Farming Operations, Environmental Permit Review Commission Web site, EGLE’s Brownfield Redevelopment Grant Program, MICHIGAN ECONOMIC DEVELOPMENT CORPORATION, Michigan Economic Development Corporation, Small Business Pollution Prevention Loan Program, Michigan Business Pollution Prevention Partnership, Environmental Assistance Center: 800-662-9278, Nondiscrimination in EGLE Programs (English, El español and Ø§ÙØ¹Ø±Ø¨ÙØ©). If the site under consideration is a brownfield (old industrial site or site of environmental contamination), consider calling the city to investigate incentives. A box has been added to the Applicant Address section to include the county.
Permits Environmental Permits Division The Environmental Permits Division (EPD) implements and oversees most of the permitting programs for MDEQ. The Air Quality Division (AQD) Permit Section has updated and revised the permit
viewed in
To complete the form,
Analysis or a
The order of authorized employee and contact information was reversed. T-BACT
The template allows you to enter information without affecting
You can also contact the program directly (phone numbers are included on the checklist to assist in this regard).
At EGLE, doing our best to help assure permits are issued timely is a common goal between EGLE and new businesses. call the AQD if they have not been contacted within 15 days of the application
Once your business is settled in Michigan, EGLE offers other valuable business assistance programs, including: Environmental Calendar, Events and Training, Department of Environment, Great Lakes & Energy, Perform an initial evaluation of your business or processes with the, If a permit applicant is having a dispute with EGLE during the application process, they can petition the EGLE Director to intervene. If you have any questions, please contact the Permit Coordination program through our Environmental Assistance Center at 800-662-9278. Water Permits At EGLE, doing our best to help assure permits are issued timely is a common goal between EGLE and new businesses. A person with standing, including the permit applicant, can contest a permit decision made by EGLE. The panel provides a recommendation back to the Director. When the form is complete, save and print it. within 15 days of your application submittal. Sector Permit Checklists: If your business is specific to the following operations, please utilize the checklist below.
basic application instructions and the
They may also be able to assist with other permits that may be necessary through other executive departments within the State of Michigan. and completed on your computer. any deficiencies.
The Michigan Department of Environment, Great Lakes, and Energy (EGLE) continues to inspect facilities, respond to reports of pollution, and enforce laws and permit conditions that protect public health and the environment during the COVID-19 crisis. also be
For more information, go to the, A number of regulatory programs administered by EGLE provide the right to a contested case hearing. A person with standing, including the permit applicant, can contest a permit decision made by EGLE. The Permit to Install Application form and the
Review of a Final Decision of a Contested Case. The checklist contains “yes” and “no” questions to help identify the types of activities at the proposed facility that require permits from EGLE. Michigan Air Permits System Permit to Install Application and Instructions The Air Quality Division (AQD) Permit Section has updated and revised the permit to install application form.
the form itself. signature of an Authorized Employee of the applicant. for existing equipment. If you need assistance identifying permits for a new venture, refer to our EGLE Permit Checklist first.
They also have a chat function through the web at www.michigan.org/medc.
MICHIGAN GUIDE TO ENVIRONMENTAL REGULATIONS: This guidebook is written by EGLE to assist manufacturers with regulations and can be be foundâ online at www.michigan.gov/ehsguide.
The checklist contains “yes” and “no” questions to help identify the types of activities at the proposed facility that require permits from EGLE.
Administratively Complete Permit to Install Application helps identify
contact as an Agent authorized to negotiate terms and conditions of the permit. The changes include: The new form is dated "Rev. Enter data by typing
Michigan Air Permits System Information 800-662-9278 The items of this Air Permit System page were moved to the Air Quality Division Permits Internet Page on Michigan… application instructions are now available as a Microsoft
If the Director cannot resolve the issue, then the Director selects and convenes a three-member panel that meets with the applicant and EGLE staff.